These were taking like 2 months back.
6 concrete support beams went up. Hope this will provide the required foundation. As i mentioned before, the backyard area is sinking and the developer did not do actual piling there, so we can see alot of the neighbours doing such extension having cracks there. It is only a matter of time before the whole thing rips off (well, maybe not so extreme lah), so i pray pray ours will be ok.
Once the beams have set, time to put up the brick walls.
Look left. Wall is up.
Look right. Wall is up too.
The opening for the windows.
Next up would be the ceiling and roof.
Thursday, 23 July 2009
Subscribe to:
Post Comments (Atom)
2 comments:
how many ft sq is the extension?
ipohchai,
Get extra 5 feet more. Will cost around RM 20k.
Cheap or expensive?